Satcom-C 4

USA



Launch data:

esignation 22096 / 92057A
Launch date 31 Aug 1992
Launch site CC, LC-17B
Launch vehicle Delta-7925 (#213)
Mission Telecommunications
Geostationary orbit on:
Perigee / Apogee  km
Eccentricity 
Inclination  deg
Period  min


Specifications

Prime contractor GE Astro Space
Platform GE-3000
Mass at launch 1370 kg
Mass in orbit 784 kg
Length 1 m
Width 1.6 m
Height 1.5 m
Solar array 15.1 m span
Stabilization 3-axis
DC power 1400 W
Design lifetime 12 years

Location:

BeginEndPosition
   135°W
  2 Oct 2004 225°E


C-band

Main transponders 24
Backup transponders  
Power 17 W
Bandwidth 36 MHz
Coverage  
EIRP max  
Polarization linear H/V


Ref: #3(SD388), #15 - update: 19.11.05